Entering content frame

Function documentation Least Unit Cost Procedure Locate the document in its SAP Library structure

Prerequisites

In the material master (MRP 1 view) for the material, you have set the indicator for WI for Least unit cost procedure in the Lot size field and the Lot size independent costs and storage costs indicator.

Features

Starting from the shortage date, successive requirements are grouped together to form lots until total costs per unit reach a minimum level. The total costs are equal to the sum of the lot size independent costs plus the total storage costs.

Example

Price:

$ 20

Lot size independent costs:

$ 100

Storage cost percentage:

10 %

This graphic is explained in the accompanying text

The most appropriate lot size is 2000 pieces.