Example: Project Information System
Hierarchy 
All the indicators in the database profile except Commercial eval. are activated.
Sample project PD-A has the following structure:
Description |
Level |
PD-A |
0 |
WBS-A-1 |
1 |
WBS-A-1-1 |
2 |
WBS-A-1-2 |
2 |
Networks NW and NW1 are assigned to the project. The networks and activities are assigned to the project as follows:
Activity |
Allocation |
NW1 |
PD-A |
NWA10 |
Not assigned |
NWA20 |
Not assigned |
NW |
PD-A
and |
NWA10 |
WBS-A-1-1 |
NWA20 |
WBS-A-1-2 |
There is a material component for activity NWA20.
The graphic below shows the hierarchy setup as viewed from the project structure.