!--a11y-->
Assigning Existing Routings 
...
1. In the SAP Easy Access menu, choose: Logistics ® Production ® Master data ® Routings and then Routings ® <Type of Routing> ® Change.
2. Enter the data of the existing routing in the initial screen, for example, the BOM header material and the appropriate plant and/or task list group.
3. Choose Enter and then <Routing type> ® Material allocation.
4. Enter the following data:
– The group counter of the routing to which you would like to assign the material
– The material of the production lot.
– The plant of the material.
– The production lot number in the WBS element field.
5. Choose Continue.
6. Save your routing.
