Procedure documentation Entering an Alternative Date Locate the document in its SAP Library structure

Use

When you create an alternative date, the system checks (as for a date shift) the settings in Customizing for Engineering Change Management, under Set up control data.

In the Date shift dataset, you can define a time frame within which a date shift is allowed (warning time) or not allowed (error time).

See also:

Protected Time Period

Procedure

To enter an alternative date:

You are processing a change master record or engineering change request.

  1. Click This graphic is explained in the accompanying text Alternative dates.

The Alternative date: Overview screen appears.

  1. Enter the alternative dates required.

You can assign this key only once per change number.

If you enter a date that is within a time limit for a warning message, you can still create the alternative date. However, you need to check the change objects to which you want to allocate the alternative date.

If you enter a date that is within a time limit for an error message, you cannot create the alternative date.

You can enter as many alternative dates as you need.

Note

The overview screen also shows the Object allocations indicator in the ObjID field. The system sets this indicator automatically as soon as at least one object management record is assigned to the alternative date.

See also :

Object Management Record

 