Function documentation Status Editing for Measurements Locate the document in its SAP Library structure

Use

With this function you can document the editing status of the measurements in your measurement project. The status controls which data for the measurement is open for editing. It also controls the status editing for the log sheet.

By means of the measurement status you can identify individual measurements as partial measurements. You can combine these marked partial measurements in a later step (see Combining Partial Measurements).

Prerequisites

You have authorization for status editing. The authorization is checked by the authorization object C_EHSB_STA. For more information about assigning authorizations, see the Implementation Guide (IMG) for Industrial Hygiene and Safety under Authorization Management.

You have entered the analysis results and measured values for the measurement whose status you want to change (see Entering Analysis Results and Measured Values). The measurement you want to edit must have the initial status Created (CR).

Features

A status network for measurements is included in the standard system. Between the statuses Created (CR) and Measurement Results Recorded (MERR) it contains a status profile, which you can fill with customer-specific statuses. This status network is empty in the standard system. For more information about setting up statuses, see Status Management in the IMG for Industrial Hygiene and Safety.

The system runs checks before switching the status. As this function is implemented as a user exit (IHS_MSTAT; M_STATUS), you can adapt the standard version when you configure your system. For more information about the checks, see the documentation for the user exit function module CBIH_LB61_UE_STATUS_CHECK. For general information about user exits, see the IMG for Basic Data and Tools under Manage User Exits.

The following table shows which status transitions are possible in the standard system: You can reset the statuses step by step, where PTME, NOME, MISM, IC, and RE are the final statuses that can be reset after MERR. The status Historical cannot be reset.

 

Target Status

Start Status

CR

MERR

PTME

NOME

MISM

IC

RE

HI

Created (CR)

°

X

Measurement Results Recorded (MERR)

X

°

X

X

X

X

X

Partial Measurement (PTME)

X

°

X

No Measurement (NOME)

X

°

X

Mismeasurement (MISM)

X

°

X

Inactive (IC)

X

°

X

Released (RE)

X

°

X

Historical (HI)

°

Legend

X : Possible target status

– : Not a target status

Note

If at least one measurement in a measurement project has the status Measurement Results Recorded, the system marks the measurement, the corresponding work area, and the measurement project red in the project tree; This graphic is explained in the accompanying text with the quick info text Measurement Results Recorded is placed in front of the description of the measurement project.

Measurements that are in a final status, that is measurements whose data you can no longer edit, are marked in the project tree with the color green; This graphic is explained in the accompanying text with the quick info text Measurement Completed is placed in front of the description of the measurement project. For measurements, the following statuses are final statuses:

·         Partial Measurement

·         No Measurement

·         Mismeasurement

·         Released

Activities

Starting from the measurement you want to edit, you can switch the status using the following methods:

·        Measurement Project ® Status Switch ® Measurement ® <possible target status>

·        This graphic is explained in the accompanying text with the quick info text <target status>

See also:

Checking and Releasing Log Sheets

Status Editing for Measurement Projects

 