Purpose
You create a baseline if you want to fix the processing status of a product at a specific point in time. You can later reproduce this processing status at any time.

If you work with collaborative engineering (CEP) you do not need this process. This functions described here are therefore not available in the life-cycle phases contained in the standard system in the life-cycle profile CEP.
Prerequisites
Prerequisites for Materials and Documents
You have indicated which material master records and document info records you want to fix in the baseline as relevant for configuration management.
See:
Indicating the Relevant ObjectsPrerequisites for BOMs
If you work with ECRs/ECOs, the system only gives a new change status to a BOM in the baseline if you release the relevant ECO before the baseline date.
Process Flow
You can set up the explosion profile in Customizing.
If necessary, group together additional objects in the structure of the configuration folder.
See:
Grouping Objects in the Configuration FolderAutomatic Creation
The system copies the controlled object and if necessary the structure from the configuration folder into the baseline.
See:
Automatic Completion of the StructureSee:
Fixing ObjectsManual Creation
See:
Automatic Completion of the StructureSee:
Fixing Objects