Purpose
In this process phase, you plan the stability tests, physically create the stability samples, place the stability samples into storage, and define a start date for the stability study.
Prerequisites
You have completed the following activities:
Process Flow
When you select and assign a storage condition to the stability study, the system automatically creates a physical-sample record for the stability sample to be stored and tested under the storage condition.
In the process of creating each inspection plan, you assign the strategy to the inspection plan header and the packages in the strategy to the appropriate inspection operations.
Once you create and save the testing schedule, the system automatically creates an item in the testing schedule for each storage condition specified in the stability study.

If you do not assign an inspection plan to each storage condition in the testing schedule before you print the storage list (see step 6), the system will not be able to calculate and print the storage quantities for the stability samples.
The storage list specifies the sample quantity that will be needed for each stability sample and the storage conditions under which each sample is to be stored.

You can also print the physical-sample labels when you enter the storage data for each sample (in step 8).
Result
The planning activities for the stability tests have been completed and the stability samples have been placed in storage. On the basis of the start date you specified for the stability study, the system has calculated all testing dates for the entire duration of the study. You can view these dates using the functions for
scheduling and deadline monitoring.