Entering content frame

Procedure documentation Reading Master Data Locate the document in its SAP Library structure

To display master data, proceed as follows:

  1. Branch to the header screen of the production order.
  2. Choose Functions ® Read PP master data.

A dialog box appears where you can specify which master data can be read or for which explosion date it is to be selected.

  1. Specify which master data must be read:
  1. If necessary change the explosion date for the BOM or the routing.

Note

If you want to read the master data with a particular revision status then you can leave out this step: The system copies the date from the revision status in this case.

  1. You can also specify the following data:

Note

If no production version or revision status is maintained for the material to be produced then the corresponding field is not displayed in the dialog box.

  1. Choose This graphic is explained in the accompanying text.

The system chooses the selected master data again according to the specified criteria.

 

Leaving content frame