Configuring Shipment and Transportation Scheduling in SAP APO 
Use
As of SAP APO 3.0, SAP APO offers a central service for performing shipment and transportation scheduling for the sales and supplying systems. The following section describes the settings for shipment and transportation scheduling.
Prerequisites
You have transferred master data and transaction data from the connected sales and supplying systems to SAP APO.
For more information on the prerequisites for shipment and transportation scheduling, see
Shipment and Transportation Scheduling.Procedure

Condition tables are not delivered with the standard system.
Example: Condition tables
|
Condition table |
Fields |
|
500 (transportation MRP time details) |
|
|
501 (transportation MRP time average) |
|
|
502 (transportation MRP time rough) |
|
|
510 (pick/pack time details) |
|
|
511 (pick/pack time average) |
|
|
512 (pick/pack time rough) |
|
|
520 (loading time details) |
|
|
521 (loading time average) |
|
|
522 (loading time rough) |
|
Example: Accesses (access sequence LOAD (loading time))
|
Sequential number |
Condition table |
Exclusive |
|
1 |
520 (loading time details) |
X |
|
2 |
521 (loading time average) |
X |
|
3 |
522 (loading time rough) |
X |

Scheduling uses the procedure SCHEDL that is delivered by SAP and cannot be changed.
Example: Weight unit in KG
Gross: 9,999,999,999.999 for weight group 0001.
Example: Volume unit in L
Volume: 9, 999, 999, 999.999 for volume group 0001
Example: Condition type LOAD (loading time). Key combination: Loading time rough
|
Loading group |
Duration |
|
0001 |
3:00 |
Example: Condition type PICK (pick/pack time). Key combination: Pick/pack time rough
|
Volume group |
Weight group |
Duration |
|
0001 |
0001 |
5:00 |
Example: Condition type LEAD (MRP). Key combination: Transportation MRP time rough
|
Receiving country |
Country |
Duration |
|
FR |
DE |
10:00 |
|
DE |
FR |
10:00 |
|
DE |
DE |
10:00 |
|
FR |
FR |
10:00 |
Example: Condition type TRAN (transportation). Key combination: Transportation MRP time rough
|
Receiving country |
Country |
Duration |
|
FR |
DE |
25:00 |
|
DE |
FR |
25:00 |
|
DE |
DE |
25:00 |
|
FR |
FR |
25:00 |

In SAP APO, times and dates are generally calculated using a
UTC timestamp. In R/3 the system converts to the time zone of the customer/plant. At this point in time, the calendar (work days of the customer/plant) is not taken into account during calculation.
The delivery time is dependent on the issuing plant/customer time zone. Calculation in detail:
Example: Field mapping for scheduling
|
Target field |
Priority |
Source field |
Function module |
|
LOCFR |
1 |
WERKS |
/SAPAPO/DM_MAP_WERKS_TO_LOCFR (standard mapping module for plant number to the location) |
|
MATNR |
1 |
EXT_MATNR |
/SAPAPO/DM_MAP_EXTMAT_TO_MATNR (standard mapping module for R/3 material number to the APO product number) |
Example: Define scheduling by sales document type
|
SD document type |
Description |
Delivery scheduling |
Transportation scheduling |
|
OR |
Standard order |
X |
X |