!--a11y-->
Completing the Stability Study 
Purpose
You can complete a stability study in the following ways:
When you complete a stability study, the system:
If open inspection lots still exist, you must cancel or forcibly complete these lots.
Prerequisites
You can only complete a stability study if no open test dates exist in the testing schedule (that is, dates that have not been called, confirmed, or skipped).
Process Flow
Result
The stability study process is completed.
