Process documentation Completing the Stability Study Locate the document in its SAP Library structure

Purpose

You can complete a stability study in the following ways:

When you complete a stability study, the system:

If open inspection lots still exist, you must cancel or forcibly complete these lots.

Prerequisites

You can only complete a stability study if no open test dates exist in the testing schedule (that is, dates that have not been called, confirmed, or skipped).

Process Flow

  1. You call up the stability study for processing.
  2. You execute a corresponding follow-up function in the action box to either complete, cancel, or deactivate the stability study.
  3. If you:

Result

The stability study process is completed.