Configuring ATP Check in the Sales and Supplying System 
Use
This section describes the settings required for transferring requirements and the ATP check in the sales and supplying systems.
Procedure
Example: ATP group
|
Checking group |
TotalSales |
TotalDlvReqs |
Block QtRq |
|
02 (individual requirement) |
A (single records) |
A (single records) |
X |

The value A must be set for the TotalSales and TotalDlvReqs fields.
The Block QtRq indicator must be set in both systems. Otherwise, the unlocking routines are not called in SAP APO, and the temporary quantity assignments remain in the SAP APO system.
Example: Default value for checking group
|
System |
Material type |
Plant |
Checking group (AvailCheck field) |
|
Sales system |
HAWA |
0011 |
02 |
|
Supplying system |
HAWA |
2200 |
02 |
Example: Assigning schedule line categories
|
Item category |
MRP type |
Proposed schedule line category |
|
TAN (standard item) |
PD (MRP) |
CP (MRP) |
Example: Schedule line category (standard)
|
Sched. line cat. |
Movement type |
Req./Assembly |
Availability |
|
CP (MRP) |
601 (GD goods issue: delvy) |
X |
X |

In the sales system, check the schedule line categories for account assignments. The schedule line category CS (leg/third-party business) should have the account assignment category X (all aux.acct.assgts).
Example:
Define your own requirements class (such as, ZBK) by copying the standard requirements class
041 (Order/delivery reqmt). You must set the Availability and Transfer of Requirements indicators.
The check mode in SAP APO corresponds to the requirements class in SAP R/3.
Example:
Requirements type ZBK ® Requirements class ZBK
Example: Determining the requirements type using transaction
|
Item category |
MRP type |
Requirements type |
Origin of requirements type for requirements type determination |
|
TAN |
PD |
ZBK |
0 (strategy material master, then item cat, and MRP characteristic) |
Example: Control for availability check
Checking group 02/Checking rule A (SD order)
Checking group 02/Checking rule B (SD delivery)
The following indicators are set:
In/outward movements:
Replenishment lead time
Example: Strategy
Define your own strategy (such as A1) by copying the standard strategy 10.
Set the requirements type for customer requirements straight to ZBK (order/delivery reqmt).
Example: Strategy group
Strategy group: A1
Main strategy: A1

The strategy group refers to a strategy. The strategy refers to the requirements type. The requirements type refers to a requirements class.
The requirements class from SAP R/3 is transferred to the SAP APO system during the ATP check of the sales order, and results in the check instructions as the check mode together with the business event. The prerequisite for this is that the relevant check modes have been created in SAP APO, for example, by transferring the ATP Customizing settings using the SAP APO Core Interface from SAP R/3 to SAP APO (see Integration Model: ATP Customizing indicator is set).
All other applications do not transfer a check mode. In this case, the check mode is read from the SAP APO product master. For this reason, you must enter the check mode in the SAP APO product master.
See also:
Controlling the Transfer of Requirements in Sales and Distribution Documents
Controlling the Availability Check in Shipping
Controlling the Availability Check in Sales and Distribution Processing