!--a11y-->
Copying
or Moving Sets of Hits 
· You have:
¡ Display authorization for the set of hits group that contains the set of hits you want to copy
¡ Change authorization for the set of hits group that contains the set of hits you want to move
· You have change authorization for the set of hits group in which you want to insert the copied or moved set of hits.
...
1. Call the specification workbench.
2.
In the navigation
area, double-click
<Specification Category>. <Specification
Category> stands for the specification
category of the specifications for which you have created the set of hits
that you want to copy or move.
3. Choose Utilities ® Set of Hits ® Load.
The group overview of the sets of hits is displayed.
4.
Choose
with the quick info text Display <-> Change.
5. Position the cursor on the required set of hits and choose:
¡
with the quick info text Copy if
you want to copy the set of hits
¡
with the quick info text Cut if
you want to move the set of hits
6. Position the cursor on one of the following:
¡ If you want to insert the copied or moved set of hits at a specific position within a group, position the cursor on the set of hits after the required position in the group.
¡ If you want to insert the copied or moved set of hits as the last set of hits in the group or if the group does not yet contain any sets of hits, position the cursor on the key for the group.
7.
Choose
with the quick info text Paste.
The set of hits is inserted at the appropriate position in the group.

A group can only accept a certain number of sets of hits. You set this maximum number under Specify Groups in Customizing for Basic Data and Tools. When the maximum number is reached, you must first delete a set of hits from the group before you can insert a new set of hits in the group.
