Use
If you want a change status to be generally accepted as effective, even if other changes exist for other effectivity periods, you can define the changes as always effective for a specific change number. This could be useful for a routing, for example, if one machine has been replaced by another and you only want the routing that takes the new machine into account to be selected.
Integration
Defining a change status as a basic change is only supported for leading change master records. You can define a basic change in the leading change master record using the Define basic change function and this includes all the changes from all the
assigned change packages.Prerequisites
In Customizing
Logistics General ® Engineering Change Management you have set the Assign alternative date indicator in Setup control data.Additionally the
following prerequisites must also filled:Features
The following rules apply when you define a change as a basic change:
Activities
You see a warning telling you that you cannot withdraw the definition as a basic change.