Entering content frame

Background documentation Save Without Checks Locate the document in its SAP Library structure

You can save a budget without executing any checks, providing that availability control is not active.

This is particularly useful if you want to store a budget that is still to be approved by the decision-making body. As soon as availability control is active, you can no longer save without checking the budget.

For more information on availability control, see: Structure linkAvailability Control.

Leaving content frame