Procedure documentation Transferring Operative Data and Simulation Data Locate the document in its SAP Library structure

Procedure

  1. Choose Logistics/Accounting ® Project management ® Planning.
  2. (The same functions are also in the Operative structures menu under Work breakdown structure).

  3. Choose Project ® Simulation ® Transfer project.
  4. Enter the project definition for the operative project or the simulation version.
  5. If you only want to transfer a sub-tree, enter the superior WBS element too.

  6. In Transfer to -> from choose the transfer direction.
  7. If you are transferring from and/or to a simulation version, also enter the key(s) of the simulation version(s).

  8. Choose Transfer.

 

 