Entering content frame

Function documentation Creating Simulation Versions Locate the document in its SAP Library structure

Use

You can use this function to:

As a source for copying from, you can use an existing operative project, a standard work breakdown structure, or an existing simulation version for the same project or for another project. In addition, you can stipulate that activities are copied too.

Note

When you create a simulation version using a template, only the structure of the template is copied into the simulation version. Plan, actual, and commitment values in the WBS elements are not transferred. Costs from the network costing only appear in the new version created from a source if you set the Automatic costing indicator in the network header or the costs are determined manually in the project planning board.

Actual values are only transferred if you are copying an operative project into a simulation version.

 

 

Leaving content frame