Entering content frame

Procedure documentation Scheduling Standard Networks Locate the document in its SAP Library structure

Procedure

  1. Call up a standard network (for instance in the Change standard network transaction).
  2. Choose This graphic is explained in the accompanying text or Edit ® Schedule.
  3. The Scheduling dialog box appears.

  4. Enter a start and/or finish date and the scheduling type and then choose This graphic is explained in the accompanying text.
  5. Another dialog box appears.

  6. If necessary, select an overview variant for the presentation of the dates and choose This graphic is explained in the accompanying text.

The standard network dates are displayed in the object overview.

Note

The dates determined by the system when you schedule a standard network will not be saved. You can view the scheduling log by choosing Extras ® Logs ® Scheduling.

 

Leaving content frame