Entering content frame

Procedure documentation Capacity Leveling in Scheduling or Structure Planning Locate the document in its SAP Library structure

  1. Choose one of the following options:

You proceed in the same manner for scheduling and structure planning.

  1. Enter a project definition or a WBS element and choose This graphic is explained in the accompanying text.
  2. Select the required WBS elements and choose Goto ® Capacity planning and the required function:
  1. To call up the standard overview of capacity evaluation, choose Goto ® Capacity Planning ® Run capacity report.

The Structure link standard overview lists the following data according to periods:

 

Leaving content frame