Entering content frame

Procedure documentation Checking Cost Planning Locate the document in its SAP Library structure

Use

Having planned your costs, you can then check the plan.

Procedure

  1. Go to the screen Change Cost Planning: WBS Element Overview.
  2. Choose This graphic is explained in the accompanying text , or using the quick info text Check (Ctrl.+F12).
  3. The Structure Planning: Display Message dialog box appears.

    A list is displayed, showing the WBS elements where there are planning errors. You can access error logs for the WBS elements. The logs explain what caused the errors.

  4. Close the window by choosing This graphic is explained in the accompanying text Continue.
  5. This brings you to the screen Change Cost Planning: WBS Element Overview

    The WBS elements where there are planning errors are displayed in red.

  6. Correct your planning as necessary:
    1. Overwrite the incorrect plan values.
    2. Choose This graphic is explained in the accompanying text , or using the quick info text Check (Ctrl.+F12).
    3. Save the cost planning with This graphic is explained in the accompanying text , or using quick info text Save (Ctrl.+S).

Result

In the event of an error, the following happens:

 

 

Leaving content frame