Entering content frame

Procedure documentation Creating PRTs by Copying Locate the document in its SAP Library structure

Prerequisite

You can create a production resource/tool with a PRT master record (misc.) by copying, if you are authorized to display the original PRT.

Procedure

  1. Choose Logistics/Accounting ® Project System ® Basic data ® Master data ® Production resources/tools ® Create.
  2. The initial screen for creating a PRT (misc.) appears.

  3. Enter the number of the new PRT and of the template PRT.
  4. Choose Continue.
  5. The Copy from dialog box appears.

  6. In this dialog box, select the data that you want to copy.
  7. Choose Copy from.
  8. The data that you selected in the template is copied to the new PRT master record. You can overwrite this data.

    You can also copy from a template on the Basic data screen. To do so choose Prod. Resources/Tools ® Copy from there.

  9. Save the PRT.

For information about creating PRTs with a material master record by copying templates, refer to the Structure link Material Master component LO-MD-MM).

For information about creating PRTs with a document info record by copying templates, refer to the Structure link Document Mangement component CA-DMS).

For information about creating PRTs with an equipment master record by copying templates, refer to the Structure link Equipment component (PM-EQM-EQ).

 

Leaving content frame