Entering content frame

Procedure documentation Maintaining Period Rules Locate the document in its SAP Library structure

Use

You can use the period rule to control the Structure linkperiodic tasks in the commission system. The period rules are linked to each standard agreement in the commission contract.

Procedure

...

       1.      In the commission system, choose Tools ® Administration ® Current Settings ® Maintain Period Rule.

       2.      Choose New Entries.

       3.      Enter a name for the period rule.

       4.      Choose a Reference Period and the Cycle.

       5.      Specify the effective and the technical validity date.

       6.      Select the entry and choose Periods – Active Versions in the dialog structure.

       7.      The system displays a dialog box. If you want to generate the periods, choose Yes.

       8.      Enter the date up to which the periods are to be generated.

The system checks whether the generated periods are open, meaning whether they can be processed or not.

       9.      Save your entries.

Note

You can update the entries or add to them at a later time.

You can also generate more periods at a later time.

Do not make any settings for the period rules in Customizing, as this does not have to be a unique transaction in period maintenance.

Example

You have created a period rule with the reference period month and cycle 6. The periodic tasks are thus carried out every six months.

 

Leaving content frame