Assigning Equipment Requirements to a Different
Process Element 
1. Select the row with the equipment requirement you want to assign to a different process element.
2.
Choose
with the quick info Move Equipment
Requirement.
3. Enter the number of the process element to which you want to assign the equipment requirement in the dialog box.
4.
Choose
Copy.
The system deletes the original assignment of equipment requirements to process elements and creates the new assignment with all the data of the equipment requirement. The system generates the item number automatically.