Purpose
In this process phase, you inspect the initial sample. Based on the results of the initial test, you then decide whether or not to continue the stability study. By performing the initial test, you can make sure that initial sample and subsequent stability samples (which may be created from quantity of initial sample) will meet your specific requirements for the stability study, before you proceed with the actual stability testing phase.
Prerequisites
You have completed the following activities:

For the initial test, you can create an inspection plan using the
standard QM function for creating an inspection plan or you can use the corresponding function in the
Engineering Workbench.
For the subsequent stability tests, however, you must use the functions of the Engineering Workbench to create and process the inspection plans. For this reason, SAP recommends that you use the Engineering Workbench to maintain all inspection plans for all tests in the stability study.
Process Flow
worklist for results recording.
Result
The usage decision you made for the inspection lot determines whether or not the stability study will be continued. If you have decided to continue the stability study, you can proceed with the next process phase,
Planning the Stability Tests.If you decided to discontinue the stability study, the system will automatically call up the stability study in the change mode, allowing you to execute appropriate follow-up functions in the action box (for example, to cancel the stability study).