 CLOI_PLORDI_IMP Locate the document in its SAP Library structure

This table is used if planned orders are to be created in the SAP system.

CLOI_PLORDI_IMP

Field

Type

Length

Description

EXTPLNUM

char

10

External planned order number (outside of the SAP System)

<FIELD>

char

10

Field name of a planned order

<VALUE>

char

50

Value of field <FIELD> for the planned order

 

The following fields are possible:

 

<FIELD>

Description

Required entry

Type

Length

PASCH

Planned order profile

Yes

char

4

PLWRK

Number of the plant where requirements planning, long term planning or the forecast is carried out

Yes

char

4

PWWRK

Number of the plant where the order quantity of the material produced in-house is manufactured

 

char

4

MATNR

Key for the material

Yes

char

18

BDMNG

Quantity of the material component

Yes

char

14

AVMNG

Scrap quantity forecasted to result from production

 

char

14

PSTTR

Earliest date when production starts according to the planned order

This field or field PEDTR

dats

8

PEDTR

Date when the planned order quantity is expected to be available or delivered according to the planned order

This field or field PSTTR

dats

8

GSTRS

Scheduled start date

 

dats

8

GSUZS

Scheduled start time

 

tims

6

GLTRS

Scheduled finish date

 

dats

8

GLUZS

Scheduled finish time

 

tims

6

VERID

Production version

 

char

4

KDAUF

Sales order key

 

Yes, if make-to-order production is entered in the field PASCH

char

10

KDPOS

Item number within a sales order

Yes, if make-to-order production is entered in the field PASCH

numc

6

SEQNR

Sequence number

 

numc

14

SERNR

Serial number to which a fixed key date can be assigned. This specifies a date for the production series that is used to determine the valid bill of material or routing

 

char

8

PERTR

Date of planned order creation

 

dats

8

UMSKZ

Initial value only.
Set on empty for BOM production or repetitive manufacturing

 

 

 

MDACC

Key for an action that can be carried out for a planned order. Possible actions include:

- RSMA: reset material availability

- BOME: explode bill of material

- BEMA: explode bill of material and check material availability

- MAAV: check material availability, explode bill of material, if necessary

- NEMA: check material availability without exploding bill of material

- SCHE: schedule planned order

- Customer-defined actions

 

char

4

 

Note

KDAUF together with field KDPOS requires make-to-order production as the planned order profile.

EXTPLNUM is the planned order number assigned by the external system. Planned order number PLNUM is specified by the SAP system and copied after a commit in table MAP_EXP.

AVMNG: If you do not enter a value here, the assembly scrap from the material master or bill of material is used. The total quantity consists of the required quantity and scrap quantity.

MDACC: Actions are defined by customers. The action code is saved in the planned order together with the date and time.

A planned order is fixed once it has been created, which means that planned orders cannot be changed automatically in the SAP system.

You can use the interface to change or delete fixed planned orders.

Scheduling begins at time/date transferred in CSTRS/GSUZS or GLTRS/GLUZS. However, PSTTR or PEDTR are also transferred since they are mandatory fields. The required scheduling direction determines which fields are used.

In order to enable scheduling with times, the following scheduling types must be defined in Customizing (IMG  ® Production ® Capacity Requirements Planning ® Operations ® Scheduling ® Specify scheduling type):

5 = Forward scheduling

6= Backward scheduling

 

 