 Optimizing Production Planning Considering Various Conditions Locate the document in its SAP Library structure

Goal: orders or operations are to be dispatched so that existing conditions are met

Production planning often demands that existing conditions, such as material availability, capacity availability or order priorities, are taken into account.

One possible way you can optimize production planning is as follows:

...

       1.      Planning in the SAP system occurs, for example, using demand management, material requirements planning and/or master production scheduling.

       2.      Data exchange SAP system ® external system

   Selection of all required master data
(materials, bills of material, routings, work centers, and so on)

   Selection of all required transaction data
(planned orders, current stock/requirements list, run schedule headers, and so on)

       3.      Planning and optimization in the external system with the goal to take existing conditions into account:

   Dates for planned and production orders are set

   Production versions and routings for respective planned and production orders are determined

   Planned and production orders can be created or deleted

   Operation dates are reset

   Work centers for operations are specified

       4.      Data exchange external system ®  SAP system

   Order start date and/or production version (and routings) of affected planned and production orders are changed in the SAP system

   Planned and production orders can be created or deleted

   Operation dates are reset

 