Object Planning Segment

 

In repetitive and flow manufacturing, a planning segment is the work center, on which scheduling and capacity planning or sequencing are based in a line hierarchy.

 

The planning segment is the basis for lead time scheduling and capacity planning or Sequencing.

In the planning table, the system uses the operation times at the planning segment for the display.

If you work with lead time scheduling, the system carries out midpoint scheduling for this work center when you make new entries and change existing data. This means the operation with the planning segment is the midpoint, and is scheduled first. The previous and subsequent operations are scheduled starting from this midpoint operation.

Integration

Planning table with capacity planning

In order to carry out lead time scheduling and capacity planning, you must enter the planning segment in at least one of the operations in the routing.

The system uses the standard times of the operation, in which the planning segment is used, to carry out scheduling and capacity planning,

From the planning table, you can branch to the line hierarchy to change the planning segment. You can select any work center of the line hierarchy.

Planning table with Sequencing

Scheduling is also based on the planning segment if you work with Sequencing.

If you have entered a sort buffer in the line hierarchy, you can select the planning segment in the line hierarchy, starting from the planning table. The planning segment is then either the line hierarchy header or a line segment that comes directly before or directly after the sort buffer.

More Information

Defining Planning Segments

If you work without sort buffers, the line hierarchy header is automatically used as the planning segment.