!--a11y-->
Assigning Existing Routings 
In the main R/3 menu, choose: Logistics
®
Production
®
Master data
®
Routings and then Routings ®
<Type of Routing>
®
Create.
Enter the data of the existing routing in the initial screen, for example, the BOM header material and the appropriate plant and/or task list group.
Choose Enter and then <Routing type>
®
Material allocation.
Enter the following data:
– The group counter of the routing to which you would like to assign the material
– The material of the production lot.
– The plant of the material.
– The production lot number in the WBS element field.
Choose Continue.
Save your routing.
