Entering content frame

Procedure documentation Creating Partial Requirements Using Grids Locate the document in its SAP Library structure

Procedure

  1. Select the requirements type for which you want to define an extended requirements record.
  2. Select an existing requirements record or a requirements record line.
  3. Choose Requirements Record: Details.
  4. The Edit Requirements: Details screen appears.

  5. Choose the tab called Requirements.
  6. Select "grid".
  7. The Edit Extended Requirements: Possible Entries dialog box appears.
  8. In the From and To fields, enter the start and end times of the requirements record.
  9. In the Grid field, enter the required interval in accordance with the duration of the partial requirements.
  10. Enter the target number of employees.
  11. Choose Transfer.

Result

The Edit Requirements: Details screen reappears. The partial requirements defined in the grid are displayed.

 

 

Leaving content frame