Entering content frame

Procedure documentation Changing Shift Plans Locate the document in its SAP Library structure

Use

Shift plans are both target and actual plans. The shift plan displays the employees who are selected from the evaluation path of the entry profile, and the entry objects. The calendar for the desired planning period is also displayed. Additionally, you can see more data about the selected employees, such as the organizational unit, job and personnel number, in a separate information column.

When you call up Requirements Matchup, the current personnel requirements are displayed. You can then assign employees and requirements to each other.

You can change target plans at any time before the target plans are completed. You can only edit the actual plan once you have completed the target plan. You can change actual plans at any time.

If changes or additions to the target plan are still required, the target plan might need to be completely or partially deleted.

Procedure

  1. Start a Shift Plan.
  2. Enter the desired data.
  3. Choose Save.

Result

You have edited the shift plan, and saved the data you created.

 

 

Leaving content frame