Procedure documentationInterrupting a Task List Run Locate this document in the navigation structure

 

To add, remove, change tasks or change parameter settings in a task list run, interrupt a task list run.

Prerequisites

The execution of a task list is started in background.

Procedure

  1. Choose Interrupt Task List Run.

    The task list run stops after the current running task is executed.

  2. Add, remove or change tasks or change parameter settings in the current task list.

    Note Note

    • You can only maintain tasks with status Stopped, Waiting to be executed, Finished with warnings or Errors occurred.

    • If you maintain a task with status Finished with warnings or Errors occurred, select the Execute checkbox of the task to execute this task again after resuming the task list run.

    End of the note.
  3. Choose Start/Resume Task List Run in Background to resume the task list run. The task list run resumes with the first task in the task list, which must be executed.