Background documentationABAP Basis Copy Initial Configuration Locate this document in the navigation structure

 

Disclaimer:

This function is only available if you own a "SAP NetWeaver Landscape Virtualization Management" 1.0 enterprise edition license. Contact your SAP representative to obtain a license to make this function available.

Note Note

Task lists are proprietary to SAP and can be overwritten during an upgrade. We recommend to consider SAP task lists as templates and to save SAP task lists as a copy.

End of the note.

 

After the system copy has finished, you have to carry out several cleanup and configuration steps on the ABAP target system. The data cleanup is required to delete the content of tables that contain source system information in the target system. This prevents the target system from interfering with the source system. You can use the task list SAP_BASIS_COPY_INITIAL_CONFIG to run the required cleanup and configuration steps automatically.

For more information about the implemented activities, see the description of each task, which is available in the Help column of the task list.