Purpose
This process describes how you can plan using the Transportation Planning/Vehicle Scheduling (TP/VS) component.
Prerequisites
Integration between OLTP system – APO System
If the OLTP system is an R/3 System, you must generate and activate the integration model for integration in the R/3 System.
Integration of APO and R/3
Planning within the APO System
Procedure
The planning process for TP/VS is described here. The process flow direction is described, however, all steps do not have to be carried out.
It may be sufficient to carry out planning in the background. In this case, the interactive planning step does not have to be carried out.
Planning Process TP/VS

master data.
interactive planning and planning in the background. You can then either plan interactively or in the background.
The manual maintenance of malfunctions that may occur in interactive planning when the optimization run is scheduled or the carrier is selected is also called Management by Exception.
To do this, use the DS planning board and optimization.
For more information, see:
OLTP-System – Vehicle Scheduling Supply-Network Planning – Vehicle Scheduling
Integration of APO and R/3Example
OLTP System |
Other system |
Link |
R/3 |
APO |
see here |