Purpose
This process flow describes the master data that is necessary for Production Planning and Detailed Scheduling and in which sequence you have to maintain it. If you do not use APO as an ATP server, you can transfer most master data from a connected OLTP System and simply maintain part of the settings. For more information on which master data has to be maintained after transfer from the OLTP System, see
OLTP - PP/DS Scenario and Integration Scenario: Master Data.Prerequisites
If you do not use APO as an ATP server but as a planning system, you have to perform an initial transfer of master data to APO using an
integration model in the core interface. You must transfer the master data of all products that are to be planned in APO.Process Flow
You
You
You assign the production process models to the model in the Supply Chain Engineer.