Supply Network Planning – Vehicle Scheduling 
Purpose
Supply Network Planning
is used for long-term to medium-term planning. A major advantage of this component is the Sourcing function, which allows you to specify at which location the product is procured and how it is to be procured. Sourcing is optimized using functions such as deployment and the transport load builder (TLB). Bucket capacities, which show the most detailed level for day planning, are used for product planning in Supply Network Planning.Vehicle Scheduling (VS) is a component for short-term planning. You can define planning horizons for both Supply Network Planning and VS. These horizons are dependent upon each other and must be planned separately.
In Vehicle Scheduling, the resources and transportation processes are maintained in detail to allow for very exact planning. When the orders from Supply Network Planning are converted to VS orders, the following occurs:
Prerequisites
You have maintained the relevant location master data, especially the following:
Procedure
Integration of Supply Network Planning and Vehicle Scheduling (VS)