Sales orders 

Use

In this section you will find information about how sales orders are transferred from SAP R/3 to the SAP Advanced Planner and Optimizer (SAP APO).

Features

Question

Answer

How can a sales order be created?

A sales order can be created

  • by transfer from SAP R/3
  • by creating a VMI sales order in SAP APO

 

 

What happens when data is taken from a preceding document?

If data is taken from a preceding document (quotation, bid, sales order, delivery), this results in an update of requirements records in SAP APO.

Restriction:
If rules based ATP is activated, data will not be consistently transferred from a quotation to a sales order as this function is not implemented in SAP R/3.
Rules based ATP may therefore not be carried out on the quotation.

Restriction:
If product selection is carried out on the quotation in SAP R/3, this information is not transferred to the sales order.

What should be taken into consideration for the customer scheduling agreement?

The customer scheduling agreement is a customer outline agreement in which the delivery quantities and delivery dates are agreed upon and fixed. The delivery quantities and delivery dates are given in the form of a delivery schedule. The ATP check takes place at the item level analogous to the sales order. Due to delivery scheduling it may be possible that the system can only confirm the quantity at a later date. In this case, the SAP R/3 system generates a second delivery schedule with the confirmed quantity for the date determined.
The scheduling agreement using the basic method for ATP check is supported.

Restriction:
Since rules based ATP and capable to promise checks can generate several subitems for the delivery schedule, the use of characteristic compounds in the item structure is not possible in SAP APO. This function is not currently supported.

What should be taken into consideration for quotations?

In quotations, the delivery time is used to agree a guaranteed maximum delivery time as of the placement of an order. If you create an order with reference to a quotation or a contract in which a delivery time has been agreed the system uses this value in the order item. You can specify delivery times at the header and item level. The delivery time at the header level influences the delivery times of all quotation and contract items. However, for each individual item you can specify a delivery time that deviates from the delivery time given at the header level.

This delivery time is not transferred to SAP APO. In SAP R/3, this delivery time is also not taken into account for the availability check of the offer.

What should be taken into consideration for sales orders?

Every process that runs in SAP R/3 for the availability check also runs for the basic method of the SAP APO ATP check, but without rules-based ATP.

Using the sales document type in SAP R/3 you can control which of the following are taken into account: the customer material info record, the order probability, credit limits, the scope of the incompleteness log, the roles of partners, shipping and transportation scheduling, delivery blocks, and shipping conditions (for ATP check and delivery scheduling). Using SAP APO does not alter this procedure.

SAP R/3 provides all the necessary sales order data for the ATP check to SAP APO.

Price determination, text determination, completion rules, the scope of the incompleteness log, the roles/determination of partners, delivery relevance and the determination of weight and volume (for the delivery schedule) are all carried out in SAP R/3. Using SAP APO does not alter this procedure.

Additional Information:
When using different rule controls (for example, rules-based ATP check) for sales document types, it is recommended to create your own sales document types in SAP R/3. A mixture of item types, for example free-of-charge delivery and discount-in-kind item, is not possible with the rules-based ATP check in SAP APO.

Restriction:
For a free-of-charge delivery item, price determination is carried out because the item type is changed to TAN. A mixture of item types is not supported.

If you create a free-of-charge delivery manually, the item type is retained with the basic method of the ATP check, for example item types KL, NORM, KLN.

If the customer wishes to return damaged or sample goods, you can enter these as returns in the system. The goods are booked into stock (for example, blocked stock returns). Returns are a sales document (order type RE), and trigger a delivery (returns delivery). After approval of the returns you can create a credit entry with reference to the returns. If the customer wants a replacement material you can generate a free-of-charge delivery with reference to the returns. Returns can lead to an increase of stock in SAP APO after the quality control.

The credit limit and the delivery block are taken into account independently of SAP R/3 Customizing (requirements relevance/no requirements relevance) when saving the sales order. Depending on the settings chosen, when saving the sales order a message is generated, the delivery is blocked or no confirmed quantities are written to SAP APO.

Service items (item type TAX) in the sales order are not relevant to SAP APO.

Cash sales/rush orders check directly against immediate delivery. In SAP APO this is checked using scope of check B. This is a special case where rules-based ATP checking is used for delivery because the delivery is called up directly from the sales order.

What should be taken into consideration for the availability check?

For information on the availability check in SAP APO, see also Global Available-to-Promise

An availability check also takes place in SAP APO at the plant level or storage location level. Restriction:
Only material with availability 02 (individual requirements) is transferred to SAP APO via the integration model (CIF). There is no transfer of materials with MRP total requirements and the system does not give any warning of this.

Restriction:
For cross-system processes the organizational units have to be consistently maintained when implementing rules-based ATP checks as the field catalog for condition technique (KOMGO) can also be controlled by, for example, the division.
Example:
"System 1 Division 01" and "System 2 Division 01" are also transferred to SAP APO as "Division 01" and are not further converted.
Also:
"System 1 Division 01 Chemical Industry" and "System 2 Division 01 Chemical Industry" is correct.
"System 1 Division 01 Chemical Industry" and "System 2 Division 01 Pharmaceuticals" means that in the field catalog you also need to add the logical system as a clear differentiation of the division. In SAP APO there is no mapping for identical organizational units.

What should be taken into consideration when changing a sales order?

Changes that are relevant for requirements are transferred to SAP APO. The following fields are relevant for requirements and always trigger an ATP check:

  • Plant
  • Requirements type
  • Date
  • Order quantity (-> change in weight)
  • Material number
  • Batch
  • Valuation type
  • Conversion factor for quantities
  • Shipping point
  • Route
  • Reason for rejection
  • Quantity fixed indicator
  • Order probability
  • Project number

Three cases for transfers of data changes that are not relevant to requirements are implemented as standard:

  • Delivery priority
  • Goods recipient
  • Change of configuration

As of SAP R/3 Release 4.5 the change of ordering party is carried out by overwriting. Ordering party dependent data is redetermined, the ordering party is not relevant to SAP APO.

What should be taken into account when deleting a sales order?

Deleting and canceling documents in SAP R/3 results in deletion in SAP APO, even if a reason for deletion is given.

What restrictions are there for consignment processing, as well as for returnable packaging processing and empties processing?

You cannot carry out SAP APO ATP checks for consignment, returnable packaging and empties processing. Stocks and issue elements are not transferred to SAP APO by the system. Loading/stock transfer cannot be carried out in SAP APO.

What happens when the material number is replaced in the sales order?

The replacement of the material number in a customer order results in a restriction of SAP APO functions if this material is known in SAP APO.

Restriction:
Material determination (automatic substitution of materials) in SAP R/3 and the use of product selection with ATP rules is not possible.

What should be taken into account for material listing and material exclusion?

For material listing and exclusion (controlling what materials a customer may obtain) in SAP R/3, the following applies: Materials that are to be subject to an ATP check in SAP APO can not be set with material listing or material exclusion in SAP R/3.

What should be taken into consideration for returns processing?

Returns processing is a purely SAP R/3 function that is not affected by the use of SAP APO.

What master data and Customizing data is relevant?

Master and Customizing data from SAP R/3 and SAP APO are relevant and are read by the system as needed.

How is shipment and transportation scheduling integrated?

See Shipment and Transportation Scheduling