Purpose
A sales order is entered in the R/3 System and the product availability check for the product is carried out in APO. If the requirements quantity for the requested product cannot be confirmed in full, a product substitution should be carried out based on defined rules.

No rules-based ATP can be executed currently for sub-items in the sales order.
Prerequisites
Process
In this example the product requirement cannot be covered completely. Product was P1; requested delivery date 20.07.00, order quantity 1000 pieces. A product availability check should be carried out for P1. If there is an availability shortage, rules-based ATP should be carried out. The product substitution procedure of the rule defines that product P2 should be proposed and checked after checking product P1.
Results tree
Requirements group |
Schedule line |
Date |
Requirements quantity |
Confirmed quantity |
Further functions |
P1/L1/Item 000010 |
0001 |
20.07.00 |
1000 |
905 |
(The proposed check results can still be changed here). ! Adopt schedule line |
Requirements group (product/location selection) |
Schedule line |
Date |
Requirements quantity |
Confirmed quantity |
Further functions |
P2/L1
|
0001 |
20.07.00 |
95 |
95 |
(The proposed check results can still be changed here). ! Adopt schedule line |
