Entering content frameProcedure documentation Accrual / Deferral Locate the document in its SAP Library structure

Usage

With the help of this report you perform the interest and discount / premium accrual/deferral in accordance with the resetting or difference procedure.

Prerequisites

In Customizing you have to specify the flow types involved in accrual/deferral per company code (choose Define accrual/deferral) and assign them to accrual/deferral types. For the flow types to be accrued/deferred you can specify the method (linear or interest rate proportion for discount / premium accrual/deferral, linear for other accruals/deferrals) according to which the amounts for accrual/deferral are to be calculated. The financial mathematical accrual/deferral method is only relevant for flow types in securities management. Choose Define account assignment to specify the account assignment for further processing for the corresponding accrual/deferral type,

Procedure

  1. Choose Accounting ® Closing Operations ® Accrual/Deferral ® Accrual/Deferral
  2. In addition to the company code and loan number you can enter the following selection criteria for the accrual/deferral run in the General selections area:
  1. In the Control parameters area, you specify the flows to be accrued/deferred (Discount/Premium or Other accruals/deferrals), which in turn determines the accrual/deferral procedure. Accruals and deferrals for discounts and premiums are calculated according to the difference procedure. The accruals/deferrals for the other flows (such as interest) are calculated on the basis of the reset procedure. For more information, see Accrual/Deferral.
  2. If you set the Update planned rec. price gain indicator, the system updates the planned records for borrower’s note loans in the cash flow to adjust the record for the price gain or loss (for deferral of the premium/discount).

    The accrual/deferral key date determines the accrual/deferral period. This is the period between the last accrual deferral run and the date you specify. The system defaults to the current date (today’s date), but you can overwrite it.

  3. If you do not want the postings to be made on the accrual/deferral key date, you can enter the relevant date in the Posting date field in the Posting control area. The posting date must not be before the accrual/deferral key date, and not later than the current system date. Also, the posting date may not be after the valid system date.
  4. The document date is transferred to the subledger and general ledger documents.

    You can also enter a posting period and a posting text.

    Use the Test run field to specify whether you want to carry out a simulation or update run for the accruals/deferrals. If you set the Test run indicator, the system displays an accrual/deferral list, but does not make any postings.

  5. In the Output control section you can select the variants for the list display:
  6. If you do not select any of the fields, the system displays the standard log.

    If you only want to display the totals, set the Summarized totals display indicator. If you set this indicator, the system summarizes all the amounts for a contract within the calculation period.

    If you select the Variable list output field, the system displays the log for the accrual/deferral run using the Structure link SAP List Viewer, which allows you to change the list display online.

    By double-clicking on a contract in the variable list, you can branch to the cash flow.

    If you select the Variable list output field together with the Monthly discount forecast or Yearly discount forecast field, you can display a premium/discount forecast. To do this, choose Back in the accrual/deferral list for premiums/discounts.

  7. Choose Program ® Execute.

 

 

 

Leaving content frame