Use
The interface between the Warehouse Management system (WMS) and the Production Control of the application component Production Planning (WM-PP interface) ensures direct material staging from the warehouse to production.
Prerequisites
You have set up the application component Production Planning (PP).
You have set up the application component Warehouse Management system (WMS).
You have defined number ranges for control cycles. To do this, choose the activity KANBAN ®
Define Number Range for Control Cycle in the Customizing for Production.Procedure
You have activated the interface between the WMS and PP in the Customizing for Warehouse Management under Interfaces ®
Define Production. To do this, proceed as follows:In the standard system, WMS movement type 319 is set up for material staging.
In the standard system, WMS movement type 103 is set up for goods receipt from production. This movement type is assigned to IM movement type 101.
In the standard system, storage type 100 is set up for material staging.
For more information, see
Creating Storage Bins.You define how a component is to be staged for a production supply area, and in which production storage bin.
For more information, see
Automatic Material Staging.You can only use automatic material staging if you have assigned a production storage bin to all of the staging components.
Result
The WM-PP interface is set up for material staging from the warehouse to production and for the receipt of finished materials from production to the warehouse.