Entering content frameProcedure documentation Changing the Cutoff Period Locate the document in its SAP Library structure

Procedure

To define the cutoff period:

  1. Choose Accounting ® Controlling ® Product Cost Controlling ® Cost Object Controlling
  2. Choose the component in which you want to define the cutoff period, such as Product Cost by Period ® Period-End Closing ® Single Functions: Product Cost Collector or Single Functions: Cost Object Hierarchy ® Work in Process or Results Analysis ® Cutoff Period ® Change.
  3. In Product Cost by Period and Product Cost by Order, choose Work in Process.

    In Product Cost by Sales Order, choose Single Functions ® Results Analysis.

    In Product Cost by Period, choose whether you want to calculate WIP for product cost collectors or for objects (product cost collectors or manufacturing orders) assigned to a cost object hierarchy.

    The screen Change Cutoff Period: Initial Screen appears.

  4. Enter the results analysis version for which you want to define the cutoff period, and choose ENTER.
  5. The screen Change Cutoff Period appears.

  6. Enter the cutoff period.
  7. Save the cutoff period.

Result

The system changes the cutoff period in the results analysis version. You can view the results analysis version in Customizing for Cost Object Controlling.

When it calculates the work in process, the system does not overwrite the results analysis data that precedes the cutoff period.

 

 

Leaving content frame