Prerequisites
Using the environment parameter BOMBOS_WL_DIALOG you can choose whether:
Procedure
The Display Worklist screen appears.
The following key sequence is displayed for the bill of material: material number - plant - usage - alternative.
Assigning a Missing Specification-Material Assignment
The system displays the Specification data group box with the Specification field.
If you do not assign a specification, the SAP System creates a specification during generation.
Resetting an Error Entry
Generating the Composition
When you exit the worklist, you must save if you want the changes to be transferred.
Result
The composition is generated if the BOM items
The specification key is displayed in the worklist as a branch with all its components and the calculated proportions. The specification is assigned the identifier NUM BOM (material number, plant, usage, alternative).
See also
Bill of Material Transfer, Prerequisites.