Entering content frameFunction documentation Customizing Time Evaluation Locate the document in its SAP Library structure

Use

The special structure of time evaluation means that numerous Customizing options are available to enable you to take account of company-specific requirements when evaluating recorded time data. These options include Customizing tables and process control features that can be modified in line with your requirements.

Features

Unlike conventional time evaluation programs, where it is often necessary to make coding changes to cater to company-specific requirements, R/3 Time Evaluation provides a highly flexible program to control and customize time evaluation.

Example

You can specify in time evaluation how excess flextime hours should be processed at the end of the month for individual employee subgroup groupings.

You can also define other procedures, such as capping the flextime excess at the end of the month, or allowing the employee to take time off for excess flextime hours.

There are two simple methods of customizing the time evaluation component to cater to your company-specific requirements:

Note

For more information, see the sections on time evaluation in the Implementation Guide.

 

Leaving content frame