Entering content frameFunction documentation Activating Availability Control Locate the document in its SAP Library structure

Use

In the budget profile, you use Activation Type to define whether, and how, availability control is to be activated.

Features

There are three different activation types:

If you chose background activation, you can activate Online Availability Control for a specific project.

Activities

When availability control is activated, the system does the following:

After activation, each posting to the project is checked by the availability control.

Note

As availability control affects system performance, you should activate it in the background for projects with less detail, only when you think that the budget may be exceeded.

Leaving content frame