Activating Availability Control
Use
In the budget profile, you use Activation Type to define whether, and how, availability control is to be activated.
Features
There are three different activation types:
If you chose background activation, you can activate Online Availability Control for a specific project.
Activities
When availability control is activated, the system does the following:
After activation, each posting to the project is checked by the availability control.

As availability control affects system performance, you should activate it in the background for projects with less detail, only when you think that the budget may be exceeded.