The Validation Maintenance screen appears. In the Control area on the left, expand the node for the required application area. You can then expand the node for your required callup point. Select the node of the required validation. The Change Validation: <Validation Name> (Header data) screen appears.
A prerequisite or check is limited to 33 lines.
Additional Processing Functions Change Validation: <Validation Name> (Header data) Screen
Choose |
Function |
Validation ® Transport |
Transport the validation to another system. For more information, see Transporting Validations/Substitutions/Rules. |
Validation ® Delete |
See: Deleting a Validation |
Extras ® ... |
See: Creating a Validation |
Environment ® ... |
See: Creating a Validation |
Moving a Validation Step
During processing of a validation the steps are numbered sequentially by the system automatically. Move steps as follows: Mark the node of the step you wish to move. You can then move the step to the node of a different step. The selected step is inserted after the target step (Drag and Drop method). This only possible within a validation.