Entering content frameObject documentation Detailed Reports for Materials Locate the document in its SAP Library structure

Definition

Reports based on the data of the existing material cost estimates in the system

Use

In the selection screen, you can directly enter the cost estimate data for the report you are calling up or search for it with This graphic is explained in the accompanying text Cost Estimate.

Before calling up the report, you can make a number of settings (some of which you can change in the report) in the selection screen:

If you want to have multiple low-level codes displayed in the itemization, choose Settings ® BOM Explosion. You can also specify that only material items should be displayed. You can have an additional field Level displayed that shows the low-level codes of the respective report lines.

See also:

Leaving content frame