Entering content frameFunction documentationDispatching of Requirements Locate the document in its SAP Library structure

Use

You use this function if you want to fix the scheduling of the provisional operations and splits intended for a work center/person.

Features

From the provisionally planned, but not binding requirements for a work center or a person, the planner dispatches the individual requirements of a work center or a person in specific planning periods. The planner uses dispatching to fix the processing of the tasks by the work center and thereby reduce the available capacity of the work center.

Caution

The system does not change the data for dispatched operations/splits even if you reschedule the order.

On the planning boards, the planner can also dispatch requirements for a different work center than the one originally entered in the operation.

For more information, see Structure link Functions in the Graphical Planning Board and Structure link Functions in the Tabular Planning Board.

 

 

 

 

Leaving content frame