Posting Goods Receipt for Material Produced In-House 

Use

Production of the T-20600 component for the turbine is complete. In the following, you post the goods receipt for the production order to project stock.

Procedure

  1. Call up the transaction as follows:
  2. Menu Path

    From the Shop Floor Control node, choose Goods Movement ® Goods Receipt

    Transaction Code

    MB31

  3. Enter the following data:
  4. Field

    Data

    Movement type

    101

    Order

    <Number of your production order>

    Plant

    1300

    Storage location

    0001

  5. Choose .
  6. Choose .

The goods receipt of the completed component (T-20600) is posted to the warehouse.

Result

The component produced is posted to the project stock during goods receipt. The following applies for the current stock/requirements list:

Switch to session three Stock/Requirements or call up the current Stock/Requirements List again. To evaluate the current data, choose .

The component produced is posted to the project stock. The stock is displayed only for WBS element T-10##. The production order is credited accordingly.