Recording Findings and Processing Repair With Additions to Order 
Purpose
The production department has e-mailed the plant maintenance department to inform them that pressure in a particular pump has fallen. In addition, a large quantity of water has collected below the pump.
The person responsible in plant maintenance has created a maintenance order (including a malfunction report) to investigate the problem. When the cause has been explained, the findings are included in the malfunction report. Corrective measures are entered in the maintenance order. The person responsible then checks to see if the required sealing materials are available and assigns them to the order. When the order has been released and the shop papers printed, the employee removes the materials from storage. They then confirm the time spent and other additional data. Technical confirmation is used to help document the problem and log necessary maintenance activities, a brief cost analysis is performed, and the order is completed.

You can also perform this scenario as a continuation of a preventive maintenance measure for which maintenance plans are used. In this case the pump inspection order is scheduled in a maintenance plan. You can then proceed and create a malfunction report.
Process Flow
You can find the data for this process under