Lot Sizes with Splitting and Overlapping
Use
You can determine whether a fixed or period lot size is divided into partial quantities and that these are to be produced at regular intervals that overlap each other.
This lot-sizing procedure is very useful if the actual requirement quantities that occur in the period or the quantity to be produced for a certain date are very large but production is only laid out for smaller quantities.
Integration
Splitting and overlapping are only possible for fixed lot sizes and period lot sizes.
Prerequisites
Fixed Lot Size with Splitting and Overlapping
Period Lot Size with Splitting and Overlapping
Features
The system generates procurement proposals for the rounding value until the fixed lot size quantity has been reached. The in-house production times overlap by the takt time.