Prep. Program - Maintaining Variants (RE-BD-BU) 
Prerequisites
Rental units that should be assigned a deletion indicator must meet the conditions set in
Check criteria.Procedure

You can only use a variant in one job. As soon as a variant has been used for one job and even once the run has ended successfully, this variant cannot be used in any other job.

You can also simulate a preparatory program by setting the indicator Create log only.
You return to the initial screen.
Choose |
Description |
Start date |
Define when or in which time intervals the preparatory program is to be performed as a background job by the system |
Spool parameters |
Define your print parameter. A result log is automatically printed after the archiving run |
Result
The archiving run is started. In accordance with the settings made and the relevant check criteria, the rental units selected are