Processing of Inspection Plans/Reference Operation Sets
Purpose
You use inspection plans to process a quality inspection in Quality Management (QM). You use reference operation sets as copy models or references.
Prerequisites
Process Flow
If you work with user-specific roles, the work area screen is not displayed. Instead, a selection screen appears.
You can use the same transaction for creating, changing or displaying a new
You enter the selection period and the selection criteria for the objects to be displayed or processed. There are two screens available with different selection criteria for this selection.
If you want to change existing objects, you must enter a change number in the screen section Process using.
If you change existing objects, these objects are loaded from the database into your worklist and are locked against the access by other users (indicated by the lock symbol).
If you want to create a new object, enter a key for the required object in the
If you want to delete an inspection plan or reference operation set, in the task list overview, select the inspection plan or reference operation set to be deleted and choose Delete.